STILL TO BE DONE ON THE HOUSE

What needs to be done:

  • Paint the kitchen walls and ceiling (90% done)
  • Paint the living room walls and ceiling (90% done)
  • Paint the dining room walls and ceiling (90% done)
  • Paint the bedroom walls and ceiling (90% done)
  • Paint the mudroom walls and ceiling
  • Paint the sun porch walls and ceiling
  • Paint 2 closets
  • Install laminate floor in 1 bedroom, landing, and 1 closet)
  • Install vinyl sheet flooring in kitchen, mudroom and sun porch.
  • Paint kitchen cabinets
  • Attach hardware to kitchen cabinets.
  • Paint exterior of the house grey (80% done)
  • Install mini-blinds, rods and sheer curtains at 20 windows
  • Install shower doors.
  • Paint 7 doors (both sides)
  • Install bedroom closet door.
  • Install door trim and window trim.
  • Paint door and window trim
  • Install baseboards in 3 bathrooms
  • Caulk baseboards
  • Install 7 door lever sets
  • Install 7 door stops